Saturday, January 11, 2014

January 11th - House Painted, Finish Work Done!

I missed the week that we finished all the finish work before it was painted. You just get to see pictures of the house painted with all the base and case done.


With most of the homes, they had enough money in their budget to have the finish work contracted out. That includes installing shelves, installing the doors, putting up trim around the doors and putting in base boards along the walls. However, our house plan is a little more expensive to build so we unfortunately (maybe?) didn't have the money to contract that work out so we installed all those things ourselves! A change of pace for us right? Not! The upside of this is that we now know how to install all those things if we ever want to rip it out and do it again with something different. The downside is that it takes time. Which means that it's time away from other things we could be doing to get further ahead. But Skylar as always was diligent and got it done in a relatively fast amount of time.

Here is the inside of our painted home: 




Standing in the living room, looking into the kitchen

Brillante, this picture is for you. This is the pantry I referenced here


Living Room


Standing in the living room, looking at the front door and closet


Dining area

Garage door


Standing in the master, bathroom to the left, closet on the right

Do you see all that beautiful casing around the doors? That is finish work and that is what Skylar did where all the other homes had it done by contractors. Boo. Ya.


Second bedroom 

Front bedroom



All the doors have to be taken off of their hinges and sprayed with paint in the basement. Notice the shims (pieces of wood) nailed into the top to hold them like an accordion



What's next for our home? Cabinets!

Monday, December 30, 2013

November 23rd - Stucco Finished

Well as of the 23rd, the stucco on our home was completely finished. The only things left to do on the outside of the house are the rock (which goes on the front) and the deck out the back door. Skylar will be building the decks for the homes (3 get decks) from what we understand and our good friend Adam will be doing the rock. That all takes place once ALL of the roofs are done. 

We had a minor set back with the fourth roof. We were under the impression that the labor done to shingle that house was going to be contracted out so we moved on to the next home. However, that did not work out and we ended up having to go back to the 4th house to shingle. This all happened the week that Utah County had its first snow storm. And it was a doozy. But we're finished with that roof and on to the FINAL roof. 

As mentioned previously, our home is the third on the list. If you're curious where the first two homes are at: they have been painted completely on the inside. The first house has begun installing the cabinetry in the kitchen. Then the lights and fixtures will be installed (by contractors) and we will install the finish plumbing and hardware. We go back and touch up the paint and I think at that point, we're done with house work. 

Picture time!


Monday, November 18, 2013

November 16th - Stucco Started

The stucco guys finished the first coat of stucco! Now, our color actually looks nothing like this. I am under the impression that this is a "primer" type of coat and the real stuff comes after this has set so that the stucco won't crack later. 

Also on the inside of the house, they mudded (is that a real verb?) the dry wall, so the next step is putting up trim, base boards and doors. AND they installed (my favorite feature) a thermostat!! It was a very cold day on Saturday, so I made a couple of trips up to our house to install our (finally delivered) basement window and just to warm up my poor little toe-sies. 

It has been a HUGE blessing how mild the weather has been so far. Our group is hoping for a late winter so that 1) we can finish framing and roofing before the snow really gets going and 2) so that we won't have to do landscaping. That depends partially on the weather. If we end up having to do it, then it adds another 2 months to the process...

PICTURES! 



60 degrees has never felt so warm to me as it did this past Saturday

Hey look! Good thing the heater was on before we had this last window installed. Sucks for the person who's paying for that...oh...wait...


Sunday, November 10, 2013

November 9th - Almost an occupiable home! (With out any finish work)

It's that time again! Quick updates and recent pictures of the house. You'll see below that the contractors are totally prepped for stucco. The inside is all finished with the drywall and cleaned up. The outside is completely wrapped in their paper stuff and chicken wire. (I have no idea what that is for). And it is completely surrounded by their rather wobblely scaffolding. We also have stucco to be done on the build-ups on the roof, so after all of Skylar's hard work shingling the whole thing, what happens? They nail in boards to stand on. Such is life!

Back and garage side of the house



Full front view

These next pictures look like some from last week, except that now it doesn't look like a dirty meth house
Front room


Bedroom


Laundry Room

Second Bedroom

Another view of the front room

Kitchen/Dining Room

Skylar and Adam working hard on the roof of the FOURTH house


Master

Same

Garage

Stairs down to the basement

How did we pass inspection? We're missing a window!

Back of the house

Saturday, November 2, 2013

November 2nd - We passed inspection!

On Tuesday, the 29th, we had an inspector come by and look over things before our actual imspection. We had the shortest list yet of things to fix and that's the hope right? That we'll get better and better at each home before inspection. Most of the things we had to fix were things we didn't know about initially so there isn't too much we can do about that.

On Thursday, the 31st (Halloween!) we had our real inspection and passed. First house to do so on the first try so far. Because of that we were able to start four way: electrical, plumbing, dry wall, HVAC, and stucco: all contracted work.

The workers were out last night and today so we were able to see how quickly they work. It's all a big mess right now, but this is what they have done so far! 

They have the wrap around the front of the house to prep for the stucco application

The garage is completely sheet rocked

The living room will be the hardest since the ceilings are so high. BUT the insulation is in

View into the kitchen

Messy bathroom on the main floor

Bedroom #1

Bedroom #2

Master bedroom

Downstairs living room area

Downstairs GIANT utility closet

What will be a downstairs bathroom

Another something room downstairs

Harry Potter's room when he comes to stay